{"id":31684,"date":"2024-03-05T09:24:42","date_gmt":"2024-03-05T09:24:42","guid":{"rendered":"https:\/\/alcalali.es\/environment\/"},"modified":"2026-05-15T05:59:23","modified_gmt":"2026-05-15T05:59:23","slug":"environment","status":"publish","type":"page","link":"https:\/\/alcalali.es\/en\/environment\/","title":{"rendered":"Environment"},"content":{"rendered":"\n<div class=\"et_pb_section_0 et_pb_section et_section_regular et_block_section\"><div class=\"et_pb_row_0 et_pb_row et_block_row\"><div class=\"et_pb_column_0 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_0 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h1>ENVIRONMENT<\/h1>\n<\/div><\/div><\/div><\/div><\/div><div class=\"et_pb_section_1 et_pb_section et_section_regular et_block_section\"><div class=\"et_pb_row_1 et_pb_row et_block_row\"><div class=\"et_pb_column_1 et_pb_column et_pb_column_1_3 et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_1 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_right\"><div class=\"et_pb_text_inner\"><h2>Integrated water management<\/h2>\n<\/div><\/div><\/div><div class=\"et_pb_column_2 et_pb_column et_pb_column_1_3 et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_2 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><p>The provision of the drinking water service in the municipality is carried out under a concession by the company Global Omnium.<\/p>\n<p>At the offices of the concessionaire company, you can subscribe to supply policies, modify or terminate the water contract, learn about the municipality's Drinking Water Regulations, make complaints and claims about the supply, pay bills, obtain information on the requirements for new conduits included in urbanization works, etc.<\/p>\n<p><strong>GLOBAL OMNIUM<\/strong><\/p>\n<p>Multi-purpose Building Calle Cipreses, n\u00ba 1-A 03728 Alcalal\u00ed<\/p>\n<p>Tel.: 96.648.24.94<\/p>\n<p>Customer service phone: 96.386.06.00<\/p>\n<p>Breakdown service phone: 96.386.06.38<\/p>\n<p>Office hours: Tuesdays from 8:00 am to 1:30 pm<\/p>\n<div id=\"gt-res-wrap\">\n<div id=\"gt-res-content\" class=\"almost_half_cell\"><\/div>\n<\/div>\n<\/div><\/div><\/div><div class=\"et_pb_column_3 et_pb_column et_pb_column_1_3 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_image_0 et_pb_image et_pb_module et_block_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/aigua.jpg\" width=\"1795\" height=\"1795\" srcset=\"https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/aigua.jpg 1795w, https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/aigua-1280x1280.jpg 1280w, https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/aigua-980x980.jpg 980w, https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/aigua-480x480.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1795px, 100vw\" class=\"wp-image-29833\" title=\"aigua\" \/><\/span><\/div><\/div><\/div><\/div><div class=\"et_pb_section_2 et_pb_section et_section_regular et_block_section\"><div class=\"et_pb_row_2 et_pb_row et_pb_equal_columns et_block_row\"><div class=\"et_pb_column_4 et_pb_column et_pb_column_1_2 et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_image_1 et_pb_image et_pb_module et_block_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/gestio-residus-alcalali.jpg\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/gestio-residus-alcalali.jpg 1920w, https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/gestio-residus-alcalali-1280x720.jpg 1280w, https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/gestio-residus-alcalali-980x551.jpg 980w, https:\/\/alcalali.es\/wp-content\/uploads\/2024\/03\/gestio-residus-alcalali-480x270.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1920px, 100vw\" class=\"wp-image-29836\" title=\"gestio-residus-alcalali\" \/><\/span><\/div><\/div><div class=\"et_pb_column_5 et_pb_column et_pb_column_1_2 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_3 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><h2>Waste management<\/h2>\n<\/div><\/div><div class=\"et_pb_text_4 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><p>The Vall de Pop Community is responsible for waste management.<\/p>\n<p>The <strong>collection service<\/strong> is carried out by the company Act\u00faa. The waste collection schedule is as follows:<\/p>\n<ul>\n<li>Urban solid waste: daily, except Sunday.<\/li>\n<li>Selective collection: containers, paper, and cardboard are collected twice a week.<\/li>\n<li>Furniture and belongings collection: biweekly. \u00a0<a href=\"https:\/\/alcalali.es\/wp-content\/uploads\/2025\/12\/CALENDARIO-RECOGIDA-DE-ENSERES-2026.pdf\" rel=\"attachment wp-att-34099\">Annual Calendar 2026<\/a><\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><div class=\"et_pb_row_3 et_pb_row et_pb_equal_columns et_block_row\"><div class=\"et_pb_column_6 et_pb_column et_pb_column_1_2 et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_image_2 et_pb_image et_pb_module et_block_module\"><span class=\"et_pb_image_wrap\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alcalali.es\/wp-content\/uploads\/2025\/05\/Logo-PRTR-dos-lineas_COLOR.jpg\" width=\"1920\" height=\"1080\" srcset=\"https:\/\/alcalali.es\/wp-content\/uploads\/2025\/05\/Logo-PRTR-dos-lineas_COLOR.jpg 1920w, https:\/\/alcalali.es\/wp-content\/uploads\/2025\/05\/Logo-PRTR-dos-lineas_COLOR-1280x720.jpg 1280w, https:\/\/alcalali.es\/wp-content\/uploads\/2025\/05\/Logo-PRTR-dos-lineas_COLOR-980x551.jpg 980w, https:\/\/alcalali.es\/wp-content\/uploads\/2025\/05\/Logo-PRTR-dos-lineas_COLOR-480x270.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1920px, 100vw\" class=\"wp-image-33721\" title=\"Logo PRTR dos l\u00edneas_COLOR\" \/><\/span><\/div><div class=\"et_pb_audio_0 et_pb_audio et_pb_audio_module et_pb_bg_layout_dark et_clickable et_pb_module et_block_module\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/alcalali.es\/wp-content\/uploads\/2026\/02\/Consulta-publica-Placas-fotovoltaivas.png\" width=\"1236\" height=\"345\" srcset=\"https:\/\/alcalali.es\/wp-content\/uploads\/2026\/02\/Consulta-publica-Placas-fotovoltaivas.png 1236w, https:\/\/alcalali.es\/wp-content\/uploads\/2026\/02\/Consulta-publica-Placas-fotovoltaivas-980x274.png 980w, https:\/\/alcalali.es\/wp-content\/uploads\/2026\/02\/Consulta-publica-Placas-fotovoltaivas-480x134.png 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1236px, 100vw\" class=\"et_pb_audio_cover_art wp-image-34926\" \/><div class=\"et_pb_audio_module_content et_audio_container\"><h2 class=\"et_pb_module_header\">Public consultation on energy generation using photovoltaic panels:<\/h2><p class=\"et_audio_module_meta\">by <strong>User: plaquesalcalali  Password: alcalaliplaques1<\/strong> | <span>PROGRAMA DUS 5000<\/span><\/p><\/div><\/div><\/div><div class=\"et_pb_column_7 et_pb_column et_pb_column_1_2 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_5 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><h2>RECOVERY, TRANSFORMATION AND RESILIENCE PLAN<\/h2>\n<\/div><\/div><div class=\"et_pb_text_6 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><h3>PHOTOVOLTAIC SELF-CONSUMPTION INSTALLATIONS IN MUNICIPAL BUILDINGS<\/h3>\n<div id=\"attachment_34891\" style=\"width: 910px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-34891\" src=\"https:\/\/alcalali.es\/wp-content\/uploads\/2026\/01\/logo-Dus.jpg\" width=\"900\" height=\"300\" alt=\"Alcalal\u00ed - Dus 5000\" class=\"wp-image-34891 size-full\" srcset=\"https:\/\/alcalali.es\/wp-content\/uploads\/2026\/01\/logo-Dus.jpg 900w, https:\/\/alcalali.es\/wp-content\/uploads\/2026\/01\/logo-Dus-480x160.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 900px, 100vw\" \/><p id=\"caption-attachment-34891\" class=\"wp-caption-text\">Alcalal\u00ed - Dus 5000<\/p><\/div>\n<p>As part of the call for investment aid for unique clean energy projects in municipalities facing demographic challenges (<strong>DUS 5000 PROGRAM \u2013 Measure 02: Renewable electricity generation installations for self-consumption)<\/strong>, included in the Regeneration and Demographic Challenge Program of the Recovery, Transformation, and Resilience Plan, the Alcalal\u00ed City Council has been awarded a grant:<\/p>\n<table border=\"1\" style=\"border-collapse: collapse; width: 100%; height: 46px;\">\n<tbody>\n<tr style=\"height: 23px;\">\n<td style=\"width: 25%; height: 23px;\"><strong>TOTAL ACCEPTED INVESTMENT\u00a0<\/strong><\/td>\n<td style=\"width: 25%; height: 23px;\"><strong>ELIGIBLE COST ACCEPTED\u00a0<\/strong><\/td>\n<td style=\"width: 25%; height: 23px;\"><strong>SUBSIDIZABLE COST<\/strong><\/td>\n<td style=\"width: 25%; height: 23px;\"><strong>TOTAL COST OF INSTALLATIONS<\/strong><\/td>\n<\/tr>\n<tr style=\"height: 23px;\">\n<td style=\"width: 25%; height: 23px;\">93,254.69 \u20ac<\/td>\n<td style=\"width: 25%; height: 23px;\">93,254.69 \u20ac<\/td>\n<td style=\"width: 25%; height: 23px;\">91,853.90 \u20ac<\/td>\n<td style=\"width: 25%; height: 23px;\">55,355.08 \u20ac<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The project consisted of 5 installations of photovoltaic solar energy systems for self-consumption with surpluses and simplified compensation with grid connection without a system storage system to supply 100% renewable electricity to the following public buildings in Alcalal\u00ed:<\/p>\n<p>1.-<strong>Town Hall:<\/strong> with collective self-consumption with simplified surplus compensation, supplying the following buildings: town hall, old town hall, medieval tower, and health center. The installation's electrical power is 17.29 kW, and its estimated annual production is 25,572 kWh.<br \/>2.-<strong>School:<\/strong> with collective self-consumption with simplified surplus compensation, supplying the following buildings: school, school cafeteria, and library. The installation's electrical power is 6.825 kW, and its estimated annual production is 9,285 kWh.<br \/>3.-<strong>Swimming Pool\/Sports center:<\/strong> with collective self-consumption with simplified surplus compensation, supplying the following buildings: swimming pool and gymnasium. The installation's electrical power is 25.025 kW, and its estimated annual production is 35,371 kWh.<br \/>4.-<strong>Ethnological Museum:<\/strong> Individual self-consumption with simplified surplus compensation. The facility's electrical power is 8,645 kW, and its estimated annual production is 11,063 kWh.<br \/>5.-<strong>Multi-purpose building:<\/strong> Individual self-consumption with simplified surplus compensation. The facility's electrical power is 12,285 kW, and its estimated annual production is 17,986 kWh.<\/p>\n<\/div><\/div><\/div><\/div><div class=\"et_pb_row_4 et_pb_row et_pb_equal_columns et_block_row\"><div class=\"et_pb_column_8 et_pb_column et_pb_column_1_3 et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_7 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h3>MUNICIPAL ECOPARK<\/h3>\n<\/div><\/div><div class=\"et_pb_text_8 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><div id=\"gt-res-wrap\">\n<div id=\"gt-res-content\" class=\"almost_half_cell\">\n<div dir=\"ltr\">\n<p>The Town Hall provides residents with the <strong>ecopark<\/strong>. This is a municipal facility that allows for the selective collection of waste for which there is no home collection service. It is a free service <strong>exclusively for residents and those registered<\/strong> in the municipality. At the Ecopark, you can deposit: <strong>glass, cardboard, plastic, metals; batteries; oils; wood; rubble, and textiles.<\/strong><\/p>\n<p>Permitted quantities to deposit:<\/p>\n<ul>\n<li>Vegetation: 1 m<sup>3<\/sup><\/li>\n<li>Rubble: 1\/2 m<sup>3<\/sup> (6 buckets)<\/li>\n<\/ul>\n<p><strong>It is not allowed to deposit<\/strong>:<\/p>\n<ul>\n<li>Items containing Asbestos (Uralita)<\/li>\n<li>Automotive oils<\/li>\n<\/ul>\n<p>The ecopark offers the following advantages:<\/p>\n<ul>\n<li>Reduces environmental impact by decreasing the volume and hazardous nature of waste that would otherwise be deposited in a landfill.<\/li>\n<li>Prevents uncontrolled dumping of waste in the municipality's surroundings.<\/li>\n<li>Contributes to sustainable development by avoiding the waste of resources found in household waste.<\/li>\n<li>Allows active citizen participation in the management of municipal resources.<\/li>\n<\/ul><\/div>\n<\/p><\/div>\n<\/div>\n<\/div><\/div><\/div><div class=\"et_pb_column_9 et_pb_column et_pb_column_1_3 et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_9 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><div>\n<div>\n<p>The available locations are detailed below:<\/p>\n<p>&#x1f3e1; <strong>ECOPARK ALCALAL\u00cd:<\/strong><\/p>\n<p>&#x1f4cd;<strong> Location<\/strong>: Cam\u00ed Sant Joan<\/p>\n<p>&#x1f552; <strong>Schedule:<\/strong> Monday and Wednesday 3.00 pm to 6.00 pm<\/p>\n<p>&#x1f4de; <strong>Contact phone:<\/strong> 96 648 20 24<\/p>\n<p>&nbsp;<\/p>\n<p>&#x1f69b; <strong>ECOM\u00d3VIL ALCALAL\u00cd:<\/strong><\/p>\n<p>&#x1f4cd; <strong>Location:<\/strong> Parking in front of the gas station<\/p>\n<p>&#x1f552;<strong> Schedule<\/strong>: Every Friday from 10:00 am to 2:00 pm<\/p>\n<p>&#x1f4de; <strong>Contact phone:<\/strong> 965 75 91 91<\/p>\n<p>&nbsp;<\/p>\n<p>This mobile service that facilitates the disposal of small special waste without the need to travel to other municipalities. At this link <a href=\"https:\/\/consorciomare.es\/ecomovil\/\" target=\"_blank\" rel=\"noopener nofollow\">https:\/\/consorciomare.es\/ecomovil\/<\/a> you can check the days and times of the mobile Ecoparks in nearby villages.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>&#x1f3ed;<\/strong><strong> \u00a0ECOPARK PEDREGUER: <\/strong><\/p>\n<p>&#x1f4cd; <strong>Location:<\/strong> Calle Vinaters, n\u00ba 4, Pedreguer<br \/>&#x1f552; <strong>Schedule:<\/strong><\/p>\n<ul>\n<li>Monday to Friday from 10:00 am to 2:00 pm<\/li>\n<li>Saturday from 10:00 am to 1:30 pm<\/li>\n<\/ul>\n<p>&#x1f4de; <strong>Contact phone:<\/strong> 965 760 669<\/p>\n<p>Regional support facility to facilitate proper waste management.<\/p>\n<p><strong>&#x267b;<\/strong><strong>&#xfe0f; Together we take care of Alcalal\u00ed.<\/strong><\/p>\n<p>Using these services responsibly helps keep our municipality clean, protect our natural environment, and move towards a more sustainable model.<\/p>\n<\/div>\n<div><\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p><span><\/span><\/p>\n<\/div><\/div><\/div><div class=\"et_pb_column_10 et_pb_column et_pb_column_1_3 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_10 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module et_pb_text_align_center\"><div class=\"et_pb_text_inner\"><h3>COVENANT OF MAYORS<\/h3>\n<\/div><\/div><div class=\"et_pb_text_11 et_pb_text et_pb_bg_layout_light et_pb_module et_block_module\"><div class=\"et_pb_text_inner\"><p>The Covenant of Mayors is an ambitious initiative by the European Commission that brings together mayors of Europe's most innovative cities in a permanent network for exchanging best practices and implementing them to improve energy efficiency in urban environments.<\/p>\n<p>The Covenant of Mayors is the response of the most proactive cities to global warming: a formal commitment to reducing CO2 emissions, even beyond the European Union's target of 20%.<\/p>\n<p>The adherence to the Covenant of Mayors by the Alcalal\u00ed Town Hall entails certain obligations and required actions. Among other obligations and commitments, the development of a Sustainable Energy Action Plan (SEAP) and the creation of a baseline emission inventory for SEAP are highlighted.<\/p>\n<p>The Baseline Emission Inventory (BEI) quantifies the amount of CO2 emitted by energy consumption in the local authority's territory in the reference year, which is considered to be 2007, and serves as the starting point for the <a href=\"\/wp-content\/uploads\/archivos\/archivo317.pdf\" target=\"_blank\" rel=\"noopener\" style=\"font-size: 16px;\">Sustainable Energy Action Plan<\/a>.<\/p>\n<p>In 2016, the Alicante Provincial Council granted a subsidy to the Alcalal\u00ed Town Hall for drafting a Follow-up Emission Inventory, allowing compliance with the Covenant of Mayors procedure.<\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_joinchat":[],"footnotes":""},"class_list":["post-31684","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/pages\/31684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/comments?post=31684"}],"version-history":[{"count":11,"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/pages\/31684\/revisions"}],"predecessor-version":[{"id":35092,"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/pages\/31684\/revisions\/35092"}],"wp:attachment":[{"href":"https:\/\/alcalali.es\/en\/wp-json\/wp\/v2\/media?parent=31684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}